Airport Simferopol

The Ministry of Affairs of Crimea on the threshold of summer 2015 is engaged in increasing the throughput the ability of the airport of Simferopol and the Kerch ferry crossing. According to the Minister for the Affairs of the Russian Peninsula Oleg Saveliev

According to Mr. Saveliev in the summer of 2014, the terminals of the only operating airport in Crimea were overloaded and worked to the limit le possibilities. By the beginning of this season, the terminals of the air harbor are planned to be doubled. In addition, the runway and other infrastructure of the air harbor are being renovated.

A large front of work is also being done on the Kerch ferry crossing. In particular, work is continuing to deepen the bottom for the opening of new berths. In the spring of 2015, the throughput capacity of the crossing should double by 2.

January 29, 2015
Comment on the news

10 fresh news

  • On March 5, the 85th Geneva Motor Show will begin its work ( 27 Feb)
  • Paris will lose one of the main attractions (27 Feb)
  • The tourist fell from a height of 500 meters, trying to make self (Feb 27)
  • There was not enough seats for the flight "Victory" All passengers (27 Feb)
  • Quidditch Championship started in Spain (27 Feb)
  • Israeli passengers nearly beat the flight attendant because of the chocolate (27 Feb)
  • Defined the most expensive ski resorts in Europe (27 Feb)
  • Marijuana smoking legalized in Washington (27 Feb)
  • The cost of overseas roaming (Feb 27)
  • The ski season in Sochi will last till May (Feb 27)